Sanctuary Renovations and Organ Replacement: Design Study Photos August 2002

These photos were taken during the design study done before the beginning of our sanctuary renovation project.

Crawl space under the chancel

Heating, ventilation, and air conditioning system
in the crawl space under the chancel

Thanks to Kevin Marshall for these photos.