Various boxes of pipes being readied for installation; hymnals
included for size comparison.



The “north” chamber of the east side chamber before
installation of the shutters that divide that chamber in half.

A view of the “shutter wall” before installation of the
shutters themselves.

A view of the dividing
wall after installation of the shutters.

The blue tape strips indicate those shutters needing
adjustment.

A view looking out of the
chamber into the chancel through the top row of shutters on
the chancel wall of the south one-half chamber in the east
lower chamber.

The same as above viewed
from the chancel side.
