Sanctuary Renovations and Organ Replacement: Photos May 16 - 20, 2005 - Part 2

Installing the wall that will support the "shutters" in the west chamber.

A "stack" of pipes for the upper west chamber.

Loading the stack into the chamber.

The 3 shutter support frames for the second level of the lower west chamber awaiting installation.

Lowering of one of the 2 blower motors into the organ blower pit on the west side of the chancel. This was a very difficult activity to get a picture of, but you get the idea!

Lots of helping hands down in the pit.

Assembling the pipe "stack" for the upper east chamber.
These pipes will be installed horizontally as shown.

Going up in the lift to get a "birds eye" view of the upper west chamber installation.

The air connection hoses for the horizontally installed pipes in the west upper chamber.

The hoses with the wind chest from whence cometh the air.

A view to the rear of that chamber.

A look across the chancel to the east upper chamber from the full lift height.

A look down at Louie Patterson standing on the floor of the lower west organ chamber.

Looking inside the top of one of the chandeliers.

Looking at the pipe installations, first on the east ...

... and then on the west side of the altar.