Installing
the wall that will support the "shutters" in the
west chamber.

A
"stack" of pipes for the upper west chamber.


Loading
the stack into the chamber.

The
3 shutter support frames for the second level of the lower
west chamber awaiting installation.

Lowering
of one of the 2 blower motors into the organ blower pit on
the west side of the chancel. This was a very difficult activity
to get a picture of, but you get the idea!

Lots
of helping hands down in the pit.

Assembling
the pipe "stack" for the upper east chamber.
These pipes will be installed horizontally as shown.

Going
up in the lift to get a "birds eye" view of the
upper west chamber installation.

The
air connection hoses for the horizontally installed pipes
in the west upper chamber.

The
hoses with the wind chest from whence cometh the air.

A
view to the rear of that chamber.

A
look across the chancel to the east upper chamber from the
full lift height.

A
look down at Louie Patterson standing on the floor
of the lower west organ chamber.

Looking
inside the top of one of the chandeliers.

Looking
at the pipe installations, first on the east ...

...
and then on the west side of the altar.

|