Installation
of new carpeting in the narthex and center and side aisles.





Staining
of the movable wall panels between sanctuary and narthex.

Completed
stained west wall before reinstallation of the windows which
were removed from the previous wall.

Restaining
the upper part of the altar is complete.
Staining the base is not yet done.

Installation
of the new chancel side walls before staining.

Hooking
up the special music audio leads in the
floor box at the rear of the sanctuary.

The
movable narthex/sanctuary walls after reinstallation of the
windows.

Checking
the electronic acoustics (ERES) system.

Altar
after completing the staining of the base.
The risers for the 2 steps still need to be stained.

Adding
dry wall to cover the exposed studs on each side of the altar
(north wall of the chancel) and completing the wood panels
on the east wall of the chancel.

This
is the separate panel housing the 5 transfer switches required
to interface the emergency lighting and fire alarm system
into the dimmer panel that controls the individual lights.

This
is the reconstruction of the pantry
walls that had to be removed in order to get the old
air handling equipment out and the new equipment in.


|