The
refinished pews finally arrived, 3 days late.

Nancy
is relieved that the pews are here; now she can
start to worry about the delivery of the choir chairs.

Installing the two smaller conduit runs for the emergency
lighting power and the fire alarm and control. The larger
diameter conduit is for the power and the smaller one for
the controls. The control logic will shut down the air handling
units in the worship space. The largest conduit was installed
previously and is the power for the chiller.


A close-up of one of the conduit support brackets.

Bob
Paige checking out the connectors in the floor box for compatibility
with his auxiliary sound systems used for special performances.

Bob
making similar checks in the chancel.

There
are more than a "few" wires involved with
this electronic acoustics system!.

Unloading the refinished pews.

"By
the numbers." Each pew is numbered
according to its location before it was removed.

Intermediate placement of the pew parts before
reassembly and return placement.

"FIRE
IN THE HOLE!" We have pressure in the HVAC system.

The
two ministers' pews placed in the narthex awaiting installation.

The
sanctuary modesty panels also await installation.

|