"Tuckpointing"
the stone surrounds on the west side of the sanctuary. This
is prepatory to sealing the brick to prevent water passing
through that wall. The same will be done on the outside east
wall of the sanctuary..

A
view of the lift used for the tuckpointing. This lift is also
used by the "glaziers" (those workers installing
the protective glass outside of the stained glass windows)
and the workers power washing and sealing the brick walls.

The
electrical power panel in the rack room .

Newly
installed narthex lights.

Stripping
the existing varnish from the alter prepatory to refinishing.

Partial
pulling of the wires for the sound system in the junction
box on the ceiling of the music closet in the hallway between
the choir robing room and the narthex.

The
sanctuary emergency lighting panel in that same closet.

The
two racks of controls for the electronic acoustics system
prior to installation in the rack room.

Nearing
completion is the installation of the duct work connecting
the supply and return air tunnels under the sanctuary and
Fellowship Hall to their respective air handling systems in
the mechanical equipment room in the basement.

The
final piece of duct work connecting the return air ducts to
the air mixing unit of air handling system 1 for the sanctuary.

That
same duct as viewed from inside the air handling unit.

The
new emergency lighting conduit for the sanctuary. This conduit
runs from the grey panel in the CLC electrical equipment room
overhead in that room and then through the wall and above
the ceiling in the CLC kitchen to the downstairs hall. From
there it goes up through the second level floor into the electrical
equipment room on the second floor. Next it runs through that
ceiling and stays above that ceiling over the north stairway
entering above the ceiling in the hall at the east end of
the Sunday School wing. Then it goes up through that roof.
Conduit will then be run over the roof to where it re-enters
the main building through new holes in the roof of the rack
room and from there to the panel in the first floor music
closet below shown previously. Whew!

The
entry from the CLC electrical equipment room
into the space above the ceiling in the CLC kitchen.

The
junction box above the ceiling in the downstairs CLC hall
and the penetration through the floor of the second floor
electrical equipment room.

The
installation of the condenser for the
rack room ceiling-mounted air conditioning unit.

Installation
and sealing of the protective glass on the east side stained
glass windows.





|