Laying
of the first piece of "vinyl sheet goods" on the
floor of the sanctuary underneath where the pews will be reinstalled.
The white substance on the concrete floor is the adhesive
applied before laying the sheet.

Unfolding
the sheet onto the adhesive-prepared concrete floor.

Laying
the second sheet.

Preparation
for the third partial sheet.

The
initial pieces of the slate tile in the front of the sanctuary
floor - extends from the chancel steps to the pew modesty
panel..

The
completed laying of the slate in the chancel.

Rolling
the sheet seams which are heat sealed.

Partial
completion of the third partial-width sheet on the west side
of the sanctuary.

A
roll of sheet goods as received.

The
cutout around the floor box at the rear of the east side of
the sanctuary.

Partial
completion of the laying of the sheet goods on the east side
of the sanctuary.

West
side cutouts for the air return "mushroom" vents
that will be reinstalled.

Wiring
the narthex speakers.

Painting
the stairwell leading from the narthex to the balcony.

Cutting
the air return vent holes.

Laying
of the vinyl sheet on the floor of the balcony.

An
overview of the main floor from the balcony
after completing laying the sheet goods.

The
completed laying of the sheet goods in the balcony
before painting of the risers and "bullnoses".

Looking
east at the progress on the laying of
the slate tile at the front of the sanctuary.

The
completed tile looking west.

|