Sanctuary Renovations and Organ Replacement: Photos March 21-25, 2005 - Part 2

West side supply tunnel duct work and
connection to west side narthex and balcony ducts.

Chancel floor beginning to take shape.

Removing wet plaster from the wall around the door to the west side of the chancel. A previous roof and gutter repair had not been sealed correctly and was permitting water to enter the wall. This was repaired at no cost by the company which had done the original work a year ago.

Total amount of wet plaster that had to be removed.

Repaired plaster on west sanctuary wall.

More repairs.

Painting the "relief" or raised border around the narthex ceiling.

Completed painted relief in contrast to walls.

Added speaker installation in the east organ chamber.

Installation of connecting duct work for the supply and return tunnels for the Fellowship Hall to air handling system 2.

Installation of duct work for the sanctuary east supply tunnel as seen from the east end of the south cross tunnel.