West
side supply tunnel duct work and
connection to west side narthex and balcony ducts.

Chancel
floor beginning to take shape.

Removing
wet plaster from the wall around the door to the west side
of the chancel. A previous roof and gutter repair had not
been sealed correctly and was permitting water to enter the
wall. This was repaired at no cost by the company which had
done the original work a year ago.

Total
amount of wet plaster that had to be removed.

Repaired
plaster on west sanctuary wall.

More
repairs.

Painting
the "relief" or raised border around the narthex
ceiling.

Completed
painted relief in contrast to walls.

Added
speaker installation in the east organ chamber.

Installation
of connecting duct work for the supply and return tunnels
for the Fellowship Hall to air handling system 2.

Installation
of duct work for the sanctuary east supply tunnel as seen
from the east end of the south cross tunnel.

|