Sanctuary Renovations and Organ Replacement: Photos March 11, 2005 - Part 4

The support pipes in both transepts for attaching up to three stage lights on each; the 3 plug-ins are visible behind the pipe.

"FIRST LIGHT" - the initial powering of the ceiling "wash" lights.

Initial powering of the sanctuary "down" lights.

A closer look. The center light which is not illuminated
is one of two center aisle spot lights.

The bases for the first and second steps from the
sanctuary up to the chancel are completed.

Here comes a section of a step.

The first section is in; working on the second one.

Initial power to the "wash" lights in the arches of the side aisles.

The steps have to be level side-to-side and front-to-back.

A pretty good day's work.