Installing
speakers in the arches over the west side sanctuary aisle.

Framing
of the extended columns and soffit on the center sanctuary/narthex
door.

Return
air tunnel and hood from Fellowship Hall into the east side
of the mechanical equipment room.

Building
storage space in the Rummage Sale Storage room.

Speakers
and brackets on high lift awaiting installation.


Speakers
after painting them to match the arches.

"Ball
mount" brackets and bases for speakers to be installed
in the organ chambers after being painted to match.

New
speakers in grill opening on west side of the limestone face
of the chancel.

New
speakers mounted in transepts.

New
speaker mounted in an organ chamber.

Installing
speakers on ceiling arch cross beam.


Electricians
working in east upper organ chamber.

Speaker
in arch over west side sanctuary aisle.

Some
of the fittings awaiting installation for the water piping
utilized in our air handling systems.

More
of these fittings.

Yet
more of these fittings.

And
yet more.

Installing
the door frames in the openings between the mechanical equipment
room and the Rummage Sale Storage room.


Measuring
for reconnecting the water lines to and from the new roof-mounted
chiller to the yet-to-be-installed three new air handlers.

Scott
braising fittings on copper tubing for the water system routing
from inside the east air supply tunnel.

Scott's
"tunnel buggy".

Origin
of west side duct work for narthex and balcony with wall filled
in.

Side
arches and inside sanctuary walls repainted.


Top
view of holes in east side of balcony floor with supply duct
work elbows attached.

Added
speakers awaiting installation after painting in the "balcony
paint shop".

Drywall
completed for the rack room in the media center and the north
acoustical equipment rack frame installed.

Installing
the south acoustical equipment rack frame.

The
inside roof-mounted air conditioner in the acoustical equipment
rack room.

An
external view of the rack room.

Ascending
air supply duct from south cross tunnel through southeast
corner of narthex.

Another look at the extended columns and the soffit at the
center entrance to the sanctuary.

The
new lighting controls that necessitated the extension.

Another
look at the newly installed speaker on the west side of the
chancel with the grill opening panel below.

Mounting
brackets for one of the ceiling arch cross beam speakers screwed
into the cross beam with lag screws.

Looking
down at one of the chandelier electrical supply junction boxes
mounted on top of the horizontal ceiling beam. Below that
is the cove at the junction of the side wall and ceiling;
the cove will hold lights, speakers, and wiring..

A
previously mounted speaker on an adjacent cross beam.

Installing
a speaker into the brackets previously screwed into the top
of the cross beam.

Installed
speaker.

Looking
down at other speaker brackets installed in the cove awaiting
attachment of the speakers.

After
installation.

"Stairway"
direct to the east upper organ chamber.

|