Sanctuary Renovations and Organ Replacement: Photos February 23, 2005

Duct work from west end of south cross tunnel through southwest corner of narthex floor; narthex runs to circular duct on left; openings for elbows to the holes in the balcony floor on right. .

A closer look at the narthex ducts.

Duct work from east end of south cross tunnel through southeast corner of narthex floor for east end of narthex and balcony.

New "dimmer" (lighting control) panel in closet off aisle on east side of chancel.

Conduit runs into the music closet off the aisle between the choir robbing room and the narthex. The conduit comes from the south tunnel through the narthex floor; over the narthex ceiling, and below the balcony floor. It will go to the rack room in the media center above.

Same for conduit coming from below through the east sanctuary tunnel.

Installation of water piping in south cross tunnel under narthex.

Water piping looking north in the east sanctuary tunnel.

Installation of one of three center aisle spots.

"Sizzor" (39 foot base) and "Son of Sizzor" (26 foot base). The added lift platform was brought in to accommodate the sound system installation at the same time as the ongoing electrical installations.

Drilling conduit connecting holes in the junction box to be installed on the ceiling of the music closet off the aisle between the choir robbing room and the narthex.

New sanctuary lights on each ceiling arch cross beam and one of the three center aisle spots.

Sound and lighting control boxes just behind the limestone facing of the chancel; this one on the east side of the chancel.

Junction box installed on the ceiling of the music closet.

Extending column walls on either side and above the center entrance between the sanctuary and the narthex to accommodate new lighting controls.

New conduit runs in the east lower organ chamber.

"Elbows" from the west supply duct over the narthex ceiling and under the balcony floor to the openings in the balcony floor.

Openings in the east side of the balcony floor before installation of the supply duct work.

Copper and iron tubing for the water piping system in the basement mechanical equipment room prior to installation.

Narthex and balcony duct work origin in east end of south cross tunnel.

Same in west end of south cross tunnel.

Water piping installation in east end of south cross tunnel.

Center air return tunnel under sanctuary as "sized" by Dale Parker.

Same for south cross tunnel.

Same for 2nd level of basement tunnel.

Same for 1st (floor) level of basement mechanical equipment room.

An "adjacent" cleaning and construction project as organized by the co-chairpersons of the Rummage Sale Committee.

Rummage Sale Committee "worker bees".

Unpacking of speakers to be installed as part of our new electronic acoustics system..