Sanctuary Renovations and Organ Replacement: Photos February 15, 2005

New sanctuary lights on each ceiling arch.

Re-installing controls and compressor to make room for new air handling units in mechanical equipment room.

High lift crane and its supply truck setting up to remove two existing chillers and install the one new chiller to be used by air handling units 1 & 2 serving the sanctuary, balcony, narthex and Fellowship Hall.

35 Positioning the "outriggers" to support the crane.

Unloading blocks that go underneath the outriggers to protect the parking lot surface.

Two existing roof top chillers prior to removal.

Unloading crane counterweights from supply truck to bed of crane platform prior to attaching to the rear of the crane before starting to lift.

Counterweights after attaching to crane.

Existing chiller #1 lifts off for removal.

Chiller #1 airborne.

Chiller #1 placed on truck for removal from site and steel frame for new chiller being readied for lifting.

Existing chiller #2 lifts off for removal.

Chiller #2 airborne.

Chiller #2 placed on truck for removal from site; steel frame for new chiller being readied for lifting.

New frame liftoff.

New frame airborne.

New frame being located.

New frame being welded in place and vibration isolators being readied for installation on frame prior to placement on new chiller.

Rooftop condenser for the new rack room air conditioner lifted to roof for future installation.

Vibration isolators positioned prior to drilling holes in frame for installation.

Isolator close-up.

Preparing new chiller for lifting.

New chiller liftoff.

New chiller airborne; unique view of steeple.

New chiller inbound.

Positioning chiller on frame.

Attachment of top half on the vibration isolator to the bottom of the chiller before bringing to rest on the spring-loaded base of the isolator.

Isolator coming together.

Don't you love it when a plan comes together?

Removal of balcony scaffolding; ceiling and walls patched, primered and painted.

Audio crew meeting in the new rack room; the reflection from the red cross on Mark Turpins hardhat is a wonderful coincidental.

New back west chancel door being "opened".

88 One of two new doors between the mechanical equipment and rummage sale storage room being "opened".