Sanctuary Renovations and Organ Replacement: Photos February 11, 2005

Hanger brackets and top guide rail for folding partition between sanctuary and narthex

Patching and painting of sanctuary ceiling.

Pick your color of electrical wire - blue, white, red, green or black.

Drywall installed in new east upper organ chamber.

Looking at the extended high lift as a paint platform at their level.

Installation of water pipe runs under the chancel.

The "dolly" used to move workers and tools in the crawl space under the chancel.

Conduit runs between narthex ceiling and balcony floor going to the new "rack room" for the electronic acoustical controls in the media center.

The space between the east wall of the sanctuary and the roof; used for electrical runs.

Hole in the east outside aisle archway leading into the space between the east sanctuary wall and the roof shown in picture shown above.

Looking through the closet on the east side of the balcony to a hole in the archway of the east side aisle of the sanctuary and between the inside wall and roof line beyond

Metal studs for construction of the wall and door for the new electronic acoustics "rack room" in the previous alcove of the media center.

Top entry into the rack room.

Two holes for low entry into the rack room.

Looking through the closet on the west side of the balcony.