Hanger
brackets and top guide rail for folding partition between
sanctuary and narthex

Patching
and painting of sanctuary ceiling.


Pick
your color of electrical wire - blue, white, red, green or
black.

Drywall installed in new east upper organ chamber.



Looking
at the extended high lift as a paint platform at their level.

Installation
of water pipe runs under the chancel.

The
"dolly" used to move workers and tools in the crawl
space under the chancel.


Conduit
runs between narthex ceiling and balcony floor going to the
new "rack room" for the electronic acoustical controls
in the media center.

The
space between the east wall of the sanctuary and the roof;
used for electrical runs.

Hole
in the east outside aisle archway leading into the space between
the east sanctuary wall and the roof shown in picture shown
above.

Looking
through the closet on the east side of the balcony to a hole
in the archway of the east side aisle of the sanctuary and
between the inside wall and roof line beyond

Metal
studs for construction of the wall and door for the new electronic
acoustics "rack room" in the previous alcove of
the media center.

Top
entry into the rack room.

Two
holes for low entry into the rack room.

Looking
through the closet on the west side of the balcony.

|