Audio
conduit from east wall on center return air tunnel along north
wall of south cross tunnel under the narthex to the access
hole in the narthex floor leading to the electronic acoustics
equipment "rack room" in the Media Center on the
2nd floor.

Audio
conduit ascending to hole in narthex floor.

Picture
of "Creeper" which the workers use to move about
in the air supply and return tunnels.

Controls
and air compressor for the retained radiant heating system
that must be moved to make room for the new air handling equipment.

Existing
air supply and return duct work for the Fellowship Hall which
will be reattached to the new air handling system.

Where
the new south door into the Rummage Sale equipment storage
room will be located; this door is required to "slide"
the heating and cooling coils out of the air handling equipment
cabinet for servicing.

The
new north door for the same purpose as the south door.

Threading
pipe for installation of the hot and cold water supply to
and from the air handling units.

|