Sanctuary Renovations and Organ Replacement: Photos February 8, 2005

Erecting ceiling in new west upper organ chamber.

Erecting floor in new east upper organ chamber.

West end of crawl space under chancel.

North wall of crawl space under chancel.

South wall of crawl space showing north entrance to the center return air tunnel.

East end of crawl space showing pad for mounting under chancel air handling unit.

East end of crawl space showing pad for mounting under chancel air handling unit and access ladder from opening in chancel floor.

East end of east-west cross tunnel under the alter; this tunnel is not connected to any of the other tunnels under the sanctuary.

West end of east-west cross tunnel under the alter.

Electricians removing some of the old conduit in the east organ chamber.

Installation of supports and brackets for hanging the floor joist for the new east upper organ chamber.

Existing electrical box for organ and chancel ceiling.

Handing up floor joist for new east upper organ chamber.

Installing new light fixtures in east transcept.

"Lined" heating and cooling duct work as required for sound suppression for the electronic acoustics system to be installed.

Our own "electrical mole" installing sound and electrical power conduit coming from the access tunnel under the sanctuary and narthex and going to the electronic acoustics "rack room" newly constructed in the media center.

Bringing up the decking for the floor of the new east upper organ chamber.

Bringing up the ceiling joist for the new west upper organ chamber.

The floor of the new east upper organ chamber as seen from the access hole.

Looking up from the floor of the new east upper organ chamber to the peak of the roof over the chancel and the concrete block structure behind the front (south) wall of the chancel.

Looking up at the underside of the floor of the new east upper organ chamber and the access hold to it from the floor of the existing lower organ chamber.

Ceiling joists installed in the new eest upper organ chamber.

Workers spackling ceiling panels in preparation for painting.