During
the third week of our sanctuary
renovation project, we completed removing the existing
organ, removed existing mechanical equipment, prepared for
demolition of the chancel floor, and began removing the
east chancel hallway circuit breaker cabinets.
We
completed removing the organ, then loaded it
onto a truck to ship it to its new home in Memphis.









Our
organist Doris Hall with pipes from the existing organ.













We
began removing the circuit breaker cabinets
from the east chancel hallway.

We
removed the glass from the windows in the wall between the
narthex and the sanctuary in preparation for replacing that
solid wall with a folding wall which will incorporate the
same glass windows.
We
continued to remove other things from the sanctuary in preparation
for the reconstruction work.